Construction, staged using the 1939-41 causeway, took three and a half years (four summers, no winter construction) at a total cost of $100 million and the lives of five workers. Contrary to popular belief, none of them are entombed in the Bridge. It opened to traffic on schedule on November 1, 1957, and the ferry service was discontinued on the same day. The Bridge was formally dedicated on June 25, 1958.